Apex Apartments - Tacoma, Washington

Sitts & Hill Engineers, Inc was contracted to provide the structural design for the multi-family residential complex which included five stories of light frame construction over two stories of post tension parking garage. Lateral force resisting system consisted of cross-braced steel frames, which were utilized to maximize allowable glazing for views. Construction was completed in 2006. Apex Phase II began construction in 2006 and was completed in 2007.

Sitts & Hill Engineers, Inc provided the survey and structural design for the mixed-use multi-storied office, and apartment buildings. The garage access ramp on the eastern side off the building is approximately 30 feet tall.